Engineering Reports for AUSD School Sites
Introduction
After geotechnical and structural engineering reports revealed the vulnerabilities of the structures on the Lum Elementary School campus, the district commissioned studies of all soils and foundations at all other AUSD school sites. The reports found that the particular conditions found at Lum Elementary School - i.e., a combination of soils that are likely to liquefy and foundations that are inadequate to withstand that liquefaction - do not exist at AUSD's other sites.
The results can be found in the reports below.
WCDC (at Longfellow Campus)
Amelia Earhart
Bay Farm School
- Soils Analysis (draft)
- Structural Analysis (draft)
Edison Elementary School
Franklin Elementary School
Haight Elementary School
Maya Lin School
- Soils Analysis
- Structural Analysis
Otis Elementary School
- Soils Analyses
- Structural Analysis
Paden Elementary School
- Soils Analysis
- Structural Analysis
Ruby Bridges Elementary School
- Soils Analysis
- Structural Analysis
Lincoln Middle School
Wood Middle School
Alameda High School
Encinal High School
Island High School (at Longfellow Campus)
Charter Schools
Academy of Alameda (at Chipman campus)
- Soils Analysis
- Structural Analysis
ACLC/Nea (at Woodstock campus)
- Soils Analysis
- Structural Analysis